Things tagged 'cycle-lane'

limited to the area of Trust Pathways:

3 issues found for 'cycle-lane':

  • Whinney Hill roundabout: cycle lane potential?

    Created by Matthew Phillips // 0 threads

    Like the roundabout at the bottom of Potters Bank, the roundabout at Whinney Hill, the approach to Durham City from the south-east, is designed for high speeds and has no provision for cyclists. The new cycle lane up Shincliffe Peth ceases when it reaches the roundabout.

    From the photograph, taken in the autumn, you can see from the leaves on the road how little of the width of the roundabout is actually required by cars and lorries. This would seem a great opportunity to try a Dutch-style urban roundabout, with a wide cycle lane all round the outside and cutting the entering traffic down to a single lane. The curves could be tightened to reduce speeds and to give pedestrians more direct crossings of the roads.

    Please sign in to vote.
  • Cycle lanes on Front Street, Framwellgate Moor

    Created by Matthew Phillips // 0 threads

    Yes, most of the vehicles in the photograph are parked! Despite appearances they are not blocking a dedicated red-tarmac cycle path: there is in fact no particular cycling provision on Front Street. The width of the road, however, would lend itself to a wide bi-directional route being provided, segregated from the road and pavement and with priority over side-roads, with car parking spaces being retained in most cases. This would give an excellent direct route for cycle commuters from Pity Me and Framwellgate Moor, to the proposed Aykley Heads business park, the railway station, and the city centre. There may be parts of the route, such as by the Front Street shops, where this might not be possible, but on-road lanes could be provided. Currently much of the middle of the road is given over to white hatching and right-turn lanes. Some cycle parking by the Front Street shops would be good: there's plenty of car parking on-road but nowhere to lock up a bike.

    Please sign in to vote.
  • Worn out road markings, Dragon Lane

    Created by Matthew Phillips // 0 threads

    Where the on-pavement cycle lane comes to an end, the road markings which continue the NCN 14 and 70 on-road are worn out and patchy. The design of the lane to take you southbound onto the pavement is poor, because the adjacent parking means that the traffic is usually driving straight over the top of the dedicated cycle lane in the middle of the road.

    Please sign in to vote.

30 threads found for 'cycle-lane':

No planning applications found for 'cycle-lane'.

Back to top